Fittings · TS-RD
Reducers (Straight / Left / Right)
Width transitions along a run, centred or offset to keep one wall straight against a wall or beam.
Drag to orbit · scroll to zoom
Real-time 3D · illustrative
Overview
Reducers connect two tray widths as circuits drop off along a run, saving material and space. Left- and right-hand versions keep one side wall on a straight line.
Key features
- Straight, left-hand and right-hand
- Any two standard widths
Specifications
Technical data TS-RD
| Product family | TS-RD — Reducers (Straight / Left / Right) |
|---|---|
| Widths W | 100–600 (any two standard widths) |
| Side heights H | 50, 100 mm |
| Thickness t | 1.2, 1.5, 2.0 mm |
| Length | 500 mm |
| Material | Same steel grade and thickness as the matching tray |
| Perforation | Same slot pattern as the matching tray |
| Code format | TS-RD[S|L|R]-[W1]-[W2]-[H]-[finish] |
| Code example | TS-RDS-400-200-100-HDG |
Standards
References
- IEC 61537 (test reference)
Load data
Safe working loads and support spans will be published after type testing to IEC 61537. Until then, support spacing follows the project specification; our engineers can advise on typical spans for your cable load.
Finishes
Available finishes
HDGHot-dip galvanised after fabricationBS EN ISO 1461 — mean zinc ≥ 55 µm on steel 1.5–3 mm (≥ 45 µm below 1.5 mm)
PGPre-galvanised (Sendzimir) steelEN 10346 DX51D+Z275 — 275 g/m² total, about 20 µm per side
PCPolyester powder coat, RAL 7035 (any RAL on request)60–80 µm over pre-treated pre-galvanised or HDG steel
SSStainless steel 316LEN 10088-2 grade 1.4404 — marine, food and chemical areas
System
Compatible accessories
Installation
Installation notes
- Set out and fix supportsTrapeze hangers or cantilever arms on the route line; add a support within 600 mm of each fitting.
- Lay straight sectionsKeep splice joints near supports, away from mid-span.
- Join with splice platesOne plate each side, M6 round-head bolts with heads inside the tray; tighten flange nuts.
- Lay cables and fit coversTie cables to the base slots; clip covers every metre where specified.
- Earth bondingBond the run to earth where the project specification requires it.
Need a submittal?
We prepare the technical submittal for TS-RD: datasheet, dimensioned drawings, material certificates and samples, ready for consultant review.