Fittings · TS-RD

Reducers (Straight / Left / Right)

Width transitions along a run, centred or offset to keep one wall straight against a wall or beam.

Reducers (Straight / Left / Right) Drag to orbit · scroll to zoom Real-time 3D · illustrative

Overview

Reducers connect two tray widths as circuits drop off along a run, saving material and space. Left- and right-hand versions keep one side wall on a straight line.

Key features

  • Straight, left-hand and right-hand
  • Any two standard widths

Specifications

Technical data TS-RD

Product familyTS-RD — Reducers (Straight / Left / Right)
Widths W100–600 (any two standard widths)
Side heights H50, 100 mm
Thickness t1.2, 1.5, 2.0 mm
Length500 mm
MaterialSame steel grade and thickness as the matching tray
PerforationSame slot pattern as the matching tray
Code formatTS-RD[S|L|R]-[W1]-[W2]-[H]-[finish]
Code exampleTS-RDS-400-200-100-HDG

Standards

References

  • IEC 61537 (test reference)

Load data

Safe working loads and support spans will be published after type testing to IEC 61537. Until then, support spacing follows the project specification; our engineers can advise on typical spans for your cable load.

Finishes

Available finishes

HDGHot-dip galvanised after fabricationBS EN ISO 1461 — mean zinc ≥ 55 µm on steel 1.5–3 mm (≥ 45 µm below 1.5 mm)
PGPre-galvanised (Sendzimir) steelEN 10346 DX51D+Z275 — 275 g/m² total, about 20 µm per side
PCPolyester powder coat, RAL 7035 (any RAL on request)60–80 µm over pre-treated pre-galvanised or HDG steel
SSStainless steel 316LEN 10088-2 grade 1.4404 — marine, food and chemical areas

System

Compatible accessories

Installation

Installation notes

  1. Set out and fix supportsTrapeze hangers or cantilever arms on the route line; add a support within 600 mm of each fitting.
  2. Lay straight sectionsKeep splice joints near supports, away from mid-span.
  3. Join with splice platesOne plate each side, M6 round-head bolts with heads inside the tray; tighten flange nuts.
  4. Lay cables and fit coversTie cables to the base slots; clip covers every metre where specified.
  5. Earth bondingBond the run to earth where the project specification requires it.
Need a submittal?

We prepare the technical submittal for TS-RD: datasheet, dimensioned drawings, material certificates and samples, ready for consultant review.

Request technical submittal